It has recognized stable cooperation with many well acknowledged universities and institutes in china such as, Zhejiang College, Jilin University, Specialized committee of nationwide chain drive common, Institute of countrywide chain drive, Zhejiang application engineering content institute, Huhan material defense institute and it cooperated to located China First Car chain institute with National chain travel institute. The team has taken part in the producing and revising of ISO/TC100 global chain regular a number of a long time in success and hosted the sixteenth ISO/TC100 Global once-a-year conference in 2004. Thanks to our vast merchandise variety and rich activities in this market,
EPT Skilled Horizontal CNC Grinding Turning Lathe EPTT
For Turning Grinding HardbXiHu (West EPT) Dis.Hu (West EPT) Dis. of Oil Drill EPT comma Cylinders comma EPTT Marine Propeller Shaft commaEPT Mildew comma Railway Areas commaWheel Hub Turbine commaFlange commaetc
1 period OutstXiHu (West EPT) Dis.Hu (West EPT) Dis. Characteristics colon
Our company was estabEPTTd in 1969 as a military EPTTrprise at the commencing time period With more than fifty years encounter comma Currently we are EPTTized in re-designing and production EPT lathe EPTTs for every your EPTT needs and requests period of time
This sequence lathe EPTT has turning comma grinding and milling capabilities comma it can be called CNC machining cEPTTr also period It can support you help save time and increase performance for the portion which demands to be truned comma grinded and milled time period
1 rpar period of time Have Load as EPT as Attainable colon Internationally forerunner computation technologies and optimized finite aspect investigation approaches are adopted and the selected components are suited for the design and style time period
2 period of time rpar period EPT Rigidity comma Balance and EPT Maintenance colon All castings are created of high-energy meehanite EPTT250 interval which is particularly ideal for large cutting time period All huge castings stand the test of annealing and vibration getting older and inside stress is removed comma so the all round precision is tremendously enhanced and processed elements are found with high geometric accuracy period of time
three interval rpar One particular-piece framework manufactured of meehanite comma significantly enhXiHu (West EPT) Dis.Hu (West EPT) Dis.ng its abrasion resistance comma and the internal force elimination procedure makes large vibration resistance and noticeably improves steadiness time period The cross-shaped foundation and rectangular bearing framework make certain substantial structural balance and forever secure good quality period
4 time period rpar The lathe mattress is in set hefty chopping composition comma incXiHu (West EPT) Dis.Hu (West EPT) Dis. rectangular difficult rails tested by EPT heat therapy and large-precision area grinding lparstraightness in entire stroke lt0 period05mm rpar time period
5 time period rparTurcite-B is pasted on the sliding floor in orEPTTto boost the rail aposs smoothness and sporting resistance period The widened difficult rail layout can provide necessary resistance and steadiness for heavy slicing period
6 period rpar The headstock comma manufactured of substantial energy and substantial rigidity keel rib comma is in EPTT cage shape comma and the EPTT incEPTTs class P5 grinding EPTs comma which can offer desirable driving accuracy and greater torque period
seven interval rpar Incorporating German AM systems comma the major shaft is made of chrome-molybdenum alloy and proves substantial precision comma higher rigid and attractive deformation resistance after rough solfinish machining comma carbonization comma ageing treatment method and precision grinding period of time The motor figures large output lpar26kw rpar and the max time period rev interval is 3000RPM interval Right after the major shaft assembling is finished comma the whole assembly shall be calibrated by dynamic equilibrium take a look at period of time The impartial lubrication will additional improve the balance of the headstock during procedure time period
8 interval rpar StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd four knife library comma mounted on a turret used in precision turning interval
9 period of time rpar The tailstock is made up of two components colon the upper one incEPTTs a sleeve relocating system comma spindle assembly comma and a shaft cEPTTrline adjustment system comma with a rectangular head in the rear comma which is created to lock the sleeve manually semi and the decrease one incEPTTs a tailstock rapidly-transferring motor and a locking system comma with the main shaft mounted on the large-precision radial clearance-adjustable double-row cylindrical roller bearing in the sleeve comma rendering the substantial-precision rotating prime on the tailstock time period However comma in orEPTTto fulfill specific EPTT specifications of the machining method comma it is possible to transfer the plug board from the flange groove in the entrance of the sleeve to the groove near the front finish of the major shaft in orEPTTto correct the major shaft and get a EPT cEPTTr period
10 rpar The main components are inspected strictly by the CMM to make sure an excellent top quality period
Our Basic principle colon MaXiHu (West EPT) Dis.mize Buyer aposs Profitability unEPTTthe minimum make investments EPT interval
Application colon This sequence CNC horizontal lathe can uEPTTze higher-pace steel and carbide cutting tools to complete tough or complete turning process for not only the non-ferrous metals like a variety of framework steels comma casting steels and irons comma but also the external solinternal cylindrical sol conical sol spherical surfaces comma thread of non-steel resources and all types of the surface area of curve rotary physique interval What aposs far more comma it can also comprehend the continual speed cutting line for turning commagrinding and milling the sophisticated components comma which saves fixture clamping time and improves functioning performance for clients period
two interval EPTnical Parameters
Identify | CG61100 | CG61125 | CG61160 | CG61200 | CG61250 | CG61300 | |
Description | Unit | ||||||
Max period of time EPTg More than Bed | mm | a thousand | 1250 | 1600 | 2000 | 2500 | 3000 |
Max period of time EPTg More than the skateboard | mm | 650 | 800 | 1200 | 1650 | 1800 | 2800 |
Max period WeigEPTT of Perform-piece | T | 10 | fifteen | twenty | 20 | twenty | forty |
Max period of time Size of Function-piece | mm | 3000-12000 | |||||
EPTs of Spindle Pace | sol | Infinitely Variable Pace solstep-significantly less speed | |||||
Range of Spindle Pace | r solMin | ten-three hundred | 10-two hundred | ten-160 | four-80 | four-80 | 1 period6-sixty three |
Chuck Diameter | mm | 800 | one thousand | 1250 | 1600 | 2000 | 2500 |
X commaZ-AXiHu (West EPT) Dis.s Feed Range | mm solMin | -3000 | |||||
Horizontal Stroke | mm | 500 | 625 | 800 | a thousand | 1250 | 1000 |
EPTTitudinal Stroke | mm | 3000-12000 | |||||
Principal Driving EPT | Kw | eleven | 22 | forty five | 75 | 75 | seventy five |
Reducing Drive lparCarriage rpar | Kn | 4 | 6 | 20 | forty | 40 | sixty |
Sleeve Diameter of EPTTilstock | mm | one hundred eighty | one hundred eighty | 290 | 290 | 290 | 480 |
Spindle Diameter of tailstock | mm | one hundred twenty five | 125 | a hundred and sixty | a hundred and sixty | a hundred and sixty | 240 |
Rermarks colon
one period of time The above 6 versions of EPT Responsibility Horizontal Lathe EPTT are the stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd configurations comma we can also design and style and manufacture EPT lathe EPTTs according to the person aposs workpiece attributes period It can be handbook or CNC manage comma each are accessible period of time
2 period of time This collection heavy responsibility horizontal Lathe has been exported to Norway comma TEPTTd comma Romania comma Iran comma Russia comma Chile comma Indonesia for machining railway areas comma vehicle elements comma mining and metallurgy comma transport constructing comma wind EPTT and other EPTTry market interval
3 time period Package and Shipment
Anti-Rust Oil sol Anti-Corrosive Oil for the EPTT EPTT comma then wrapping the protective movie
EPTen Box Package deal comma or vacumm package deal is also offered according to client aposs EPTT ask for interval
4 interval Soon after-sale Services amp Maintenance
1 interval We offer expert specialized training for users apos operators and upkeep employees to permit them to appropriately use and work the lathe and have out regular upkeep period
two period Guarantee period colon One particular calendar year following acceptance of the lathe period We can also increase the routine maintenance time for each user aposs EPTT demands to 2 or 3 a long time period
three period In situation of any top quality issue discovered throughout procedure comma the factory will dispatch staff get there to the person aposs spot inside of 48 several hours lpardomestic users rpar amp in three daEPTT lparEPT Client rpar and the complex personnel won apost depart before resolving the malfuntion interval
4 period of time The organization will freely offer various EPT and mechanical elements for the purchased lathe timely inside of warranty interval period
five interval The business will offer lifetime guarantee for the consulting solutions in conditions of application comma servicing comma restore comma renovation comma and many others of equipments period of time
For a lot more details comma remember to come to feel free of charge to speak to us time period Many thanks excl