We also can design and style and make non-common products to fulfill customers’ particular demands. We are aiming to meet up with the requires of the consumers about the world.. PersonnelOur revenue people are well skilled to accommodate your requests and communicate English for your comfort.
EPT EPT Responsibility Horizontal CNC Lathe EPTT
For Turning Milling Grinding Cylinders comma EPTT Shaft commaEPT Mould comma Railway Parts commaWheel Hub Turbine commaFlange commaetc
one time period OutstXiHu (West EPT) Dis.Hu (West EPT) Dis. Qualities colon
Our organization was estabEPTTd in 1969 as a navy EPTTrprise at the beginning period With much more than 50 several years encounter comma Presently we are EPTTized in re-designing and production EPT lathe EPTTs for each your EPTT demands and requests period of time
This series lathe EPTT has turning comma grinding and milling features comma it can be referred to as CNC machining cEPTTr also interval It can assist you save time and improve performance for the element which needs to be truned comma grinded and milled period of time
1 rpar period of time Carry Load as EPT as Feasible colon Internationally forerunner computation technologies and optimized finite element investigation methods are adopted and the picked supplies are suitable for the design period of time
two interval rpar period EPT Rigidity comma Stability and EPT Routine maintenance colon All castings are manufactured of large-energy meehanite EPTT250 time period which is particularly appropriate for weighty slicing period of time All big castings stand the take a look at of annealing and vibration getting older and inner pressure is eliminated comma so the total precision is tremendously enhanced and processed components are discovered with higher geometric precision period of time
three interval rpar A single-piece construction manufactured of meehanite comma drastically enhXiHu (West EPT) Dis.Hu (West EPT) Dis.ng its abrasion resistance comma and the inside drive elimination method produces large vibration resistance and significantly boosts steadiness interval The cross-shaped foundation and rectangular bearing composition guarantee large structural security and forever secure top quality period of time
4 time period rpar The lathe mattress is in fastened large cutting framework comma incXiHu (West EPT) Dis.Hu (West EPT) Dis. rectangular difficult rails analyzed by EPT warmth therapy and substantial-precision surface grinding lparstraightness in total stroke lt0 period05mm rpar interval
5 interval rparTurcite-B is pasted on the sliding surface area in orEPTTto boost the rail aposs smoothness and sporting resistance period The widened tough rail style can provide required resistance and stability for heavy cutting interval
six time period rpar The headstock comma produced of large energy and high rigidity keel rib comma is in EPTT cage shape comma and the EPTT incEPTTs class P5 grinding EPTs comma which can give attractive driving precision and better torque period
seven interval rpar Incorporating German AM technologies comma the major shaft is made of chrome-molybdenum alloy and proves high precision comma substantial rigid and fascinating deformation resistance soon after tough solfinish machining comma carbonization comma getting older therapy and precision grinding interval The motor figures substantial output lpar26kw rpar and the max interval rev time period is 3000RPM period of time After the primary shaft assembling is finished comma the total assembly shall be calibrated by dynamic stability examination interval The independent lubrication will additional increase the stability of the headstock throughout procedure time period
eight interval rpar StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd 4 knife library comma mounted on a turret utilised in precision turning interval
nine interval rpar The tailstock is composed of two parts colon the upper one particular incEPTTs a sleeve moving mechanism comma spindle assembly comma and a shaft cEPTTrline adjustment system comma with a rectangular head in the rear comma which is designed to lock the sleeve manually semi and the reduce 1 incEPTTs a tailstock quick-relocating motor and a locking system comma with the main shaft put in on the higher-precision radial clearance-adjustable double-row cylindrical roller bearing in the sleeve comma rendering the substantial-precision rotating prime on the tailstock period of time Nonetheless comma in orEPTTto fulfill certain EPTT requirements of the machining approach comma it is possible to transfer the plug board from the flange groove in the entrance of the sleeve to the groove in close proximity to the front stop of the main shaft in orEPTTto repair the primary shaft and get a EPT cEPTTr period
ten rpar The main elements are inspected strictly by the CMM to make sure an excellent good quality period
Our Basic principle colon MaXiHu (West EPT) Dis.mize Customer aposs Profitability unEPTTthe bare minimum make investments EPT time period
Software colon This sequence CNC horizontal lathe can uEPTTze substantial-pace steel and carbide reducing tools to end rough or end turning approach for not only the non-ferrous metals like different composition steels comma casting steels and irons comma but also the external solinternal cylindrical sol conical sol spherical surfaces comma thread of non-metallic resources and all kinds of the surface area of curve rotary physique time period What aposs more comma it can also comprehend the constant velocity slicing line for turning commagrinding and milling the complicated components comma which saves fixture clamping time and improves working efficiency for clients period
two period of time EPTnical Parameters
Name | CG61100 | CG61125 | CG61160 | CG61200 | CG61250 | CG61300 | |
Description | Unit | ||||||
Max interval EPTg Above Bed | mm | a thousand | 1250 | 1600 | 2000 | 2500 | 3000 |
Max interval EPTg Above the skateboard | mm | 650 | 800 | 1200 | 1650 | 1800 | 2800 |
Max time period WeigEPTT of Perform-piece | T | 10 | 15 | 20 | 20 | twenty | 40 |
Max interval Duration of Work-piece | mm | 3000-12000 | |||||
EPTs of Spindle Velocity | sol | Infinitely Variable Velocity solstep-significantly less pace | |||||
Selection of Spindle Pace | r solMin | 10-three hundred | 10-200 | 10-160 | four-eighty | four-80 | one period6-sixty three |
Chuck Diameter | mm | 800 | 1000 | 1250 | 1600 | 2000 | 2500 |
X commaZ-AXiHu (West EPT) Dis.s Feed Selection | mm solMin | -3000 | |||||
Horizontal Stroke | mm | 500 | 625 | 800 | a thousand | 1250 | one thousand |
EPTTitudinal Stroke | mm | 3000-12000 | |||||
Primary Driving EPT | Kw | eleven | 22 | forty five | seventy five | 75 | seventy five |
Chopping Pressure lparCarriage rpar | Kn | 4 | 6 | 20 | 40 | 40 | sixty |
Sleeve Diameter of EPTTilstock | mm | 180 | one hundred eighty | 290 | 290 | 290 | 480 |
Spindle Diameter of tailstock | mm | a hundred twenty five | one hundred twenty five | one hundred sixty | a hundred and sixty | one hundred sixty | 240 |
Rermarks colon
one period The over six types of EPT Responsibility Horizontal Lathe EPTT are the stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd configurations comma we can also layout and manufacture EPT lathe EPTTs according to the person aposs workpiece functions interval It can be manual or CNC manage comma each are obtainable interval
2 period This collection weighty responsibility horizontal Lathe has been exported to Norway comma TEPTTd comma Romania comma Iran comma Russia comma Chile comma Indonesia for machining railway components comma car parts comma mining and metallurgy comma shipping constructing comma wind EPTT and other EPTTry business time period
3 interval Package and Shipment
Anti-Rust Oil sol Anti-Corrosive Oil for the EPTT EPTT comma then wrapping the protective movie
EPTen Box Bundle comma or vacumm deal is also available according to consumer aposs EPTT request period
4 time period Soon after-sale Service amp Routine maintenance
1 period We give expert technological coaching for end users apos operators and routine maintenance workers to enable them to appropriately use and run the lathe and have out standard upkeep period of time
2 period of time Warranty period colon A single yr following acceptance of the lathe period of time We can also prolong the routine maintenance time for every consumer aposs EPTT calls for to 2 or 3 many years period of time
3 time period In case of any quality difficulty identified during operation comma the manufacturing facility will dispatch staff arrive to the user aposs location in 48 hrs lpardomestic end users rpar amp inside of three daEPTT lparEPT Buyer rpar and the specialized personnel won apost depart before resolving the malfuntion period
4 period The company will freely supply different EPT and mechanical components for the bought lathe timely inside of guarantee period time period
5 interval The organization will give life time guarantee for the consulting solutions in conditions of application comma maintenance comma fix comma renovation comma and so on of equipments time period
For far more information comma please come to feel cost-free to get in touch with us period Thanks excl