Our merchandise are utilized in many fields. Complete use has been created of all types of sophisticated techniques and engineering to get to excelsior production. If you are intrigued in any of our merchandise or would like to talk about a potential buy, please feel totally free to get in touch with us. Medium Responsibility Rack
Medium Obligation Rack is a butterfly hole shelf locking gap composition, with simple set up, no energy, to set force on the merchandise developed all-natural fixed features to alter the pitch 50MM storey principal and auXiHu (West EPT) Dis.liary body unrestricted connections, increase the firmness of the shelf conserving investment. EPT the use of P-type pipe, escalating the shelf robustness and safety.
Features:
1, column of metal EPTT profiles, butterfly hole (dovetail well) on the beam and Kits affordable plug, make dis-assembly easier, butterfly gap to 50mm as a device, the heigEPTT can be adjusted up and down any connection. Laminates are chilly-rolled metal, laminates adhering to system can be spot-rolled tremendous-sort ribs to solitary bearing can one hundred fifty-500KG.
two, shelf device size is generally no a lot more than 2m, width of not more than 1m, heigEPTT EPTTly less than 3m. If the shelf device length considerably less than 2m, layer contained much less than 500kg.
three, extensive butterfly gap shelf apps, not only can do warehouse storage use can also be utilised at the mall exhibit. Demand from customers for warehouse dimension can be EPT in accordance to the person the rigEPTT shelf, we have a skilled plan designer.
Business Information
Design | Medium Duty Rack P00006# | |||||||||
Size | A) 1500mm EPTT | B) 1800mm EPTT | C) 2000mm EPTT | D) 2440mm EPTT | ||||||
A) 300mm broad | B) 450mm broad | C) 600mm wide | D) 750mm wide | |||||||
A) 1500mm higher | B) 1800mm substantial | C) 2000mm large | D) 2500mm wide | |||||||
EPTs Optional | A) EPTT Steel Q235A utilised for regular temperature storage scenario | |||||||||
B) EPTT Metal Q235B used for chilly storage space | ||||||||||
C) EPTal security powEPTTfor surface area remedy–powEPTTcoating | ||||||||||
Craft-work | A) hole-punching | B) cold rolling | C) welding | D) powEPTTcoating | ||||||
Structure | A) bolted construction | B) welded structure | ||||||||
EPTT | A) as to our stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd model | B) in accordance to customer’s requests | ||||||||
Pack product | A) stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd export EPTT | B) in accordance to customer’s requests | ||||||||
Package deal material | A) transparent and dust-evidence poly-sheet | |||||||||
B) tough carton paper | ||||||||||
C) EPTT and slim plywood bar | ||||||||||
D) plywood pallet metal and plastic straps | ||||||||||
E) air bag used when loading container | ||||||||||
MOQ | 5-10 sets the design is matter to your demands | |||||||||
Payment | A) T/T | B) LC | C) Paypal or Western EPT | |||||||
Warranty | A) a single year towards manufacturing defect | |||||||||
B) offer life span session on problems transpired | ||||||||||
EPTtity | A) 20′ container | B) 40′ container | C) a sample buy | |||||||
17500kgs | 26000kgs | one set | ||||||||
Shipping time | In fifteen days | In 20 times | In seven times | |||||||
Note | All racks can be EPT |
EPTT details
Container Loading
FAQ
a: May possibly I know the position of my get?
We will deliver you photographs or video and support you to update.
b: Fast production time
For Normal orders, we will guarantee to generate inside of 15 workdays.
As a manufactory, we can essure the delivery time in accordance to the formal deal.
c: What is shipping moments?
Generally, shipping and delivery time is inside of twenty workdays.
d: What is the phrase of payment?
T/T: thirty% deposit in EPT soon after confirmed get,
70% harmony payment just before cargo
WESTERN EPT, PAYPAL
Contact Information